The First Step of Every VL Builders Project

The Build Study: See Your Design and Your Real Budget Before You Commit

Most remodels start with a guess. Ours start with answers: what your home could become, what it will take, and what it will really cost.

Dining room in a Golden, CO main floor remodel by VL Builders, with a butcher block table and plants in the bay window
The Remodeling Gamble

Why Free Estimates Cost So Much

A free estimate is a number written before anyone has measured your home, designed your space, or checked what's behind the walls. It's a guess, and guesses get corrected later, usually after you've signed.

The design you fall in love with turns out to cost far more than the number you were quoted.
Structural, zoning or code problems show up after the walls are open.
Change orders pile up because the details were never decided before construction.

The Build Study replaces the guess with real answers, before you commit to anything bigger.

Sunroom addition on a home in Lakewood, Colorado
Phase 1 of Design

What Is The Build Study?

The Build Study is the paid first phase of our two-phase design process. After your Discovery Call and an honest conversation about budget, our design team studies your home, designs real options, and prices them, so you can decide with confidence whether, and how, to move forward.

It's the same idea behind the planning step used by the most respected design-build firms in the country: answer the hard questions first, then build.

VL Builders design team reviewing plans with homeowners
What's Included

What's Included in Every Build Study

Real measurements, real drawings and real options, priced at the finish level you actually want.

01

A detailed site measure

We measure the spaces you're remodeling, so every option starts from your real home.

02

As-built drawings

Drawings of your home as it stands today.

03

Up to three layout options

Conceptual layouts, reviewed with you in person.

04

A materials and finishes conversation

A guided talk about finishes, so your budget reflects the level of finish you actually want.

05

A realistic project budget

A budget based on the direction you choose.

When your project needs it, we also include

Asbestos testing

So there are no surprises when walls and floors come out.

For additions

Zoning and code research, a geotechnical soils report if your site requires one, and a structural engineering consultation.

How It Works

How The Build Study Works

1

Discovery Call and home visit

We learn your goals and talk openly about budget.

2

Sign The Build Study

One simple agreement to get started.

3

We study your home

Site measure, as-built drawings, and any testing or research your project needs.

4

Design review

We walk you through up to three conceptual layouts and talk through finishes.

5

Budget review

You see a realistic budget for your design and decide your next step.

The Build Study averages about 51 days.

“

So, we've all had horror stories with contractors, right? I can tell you honestly that I've never had a better contractor experience... From the first estimate, to the design phase, to the pricing, to the options to the work, invoicing and follow through... these folks were EXACTLY what you want from a contractor.

Nick B. · Google review
Your Results

What You Know at the End

What your home could become, with real layouts, not sketches on a napkin
What your lot and your structure will allow
What your project will realistically cost at the finish level you want
What it will take to move forward, and how long it will take

Whether you continue with us or not, you'll make your decision with facts. Everything we produce, including drawings and your budget, remains the property of VL Builders. You get copies for reference, not to bid or build your project elsewhere.

Phase 2 of Design

Then, Plan Development

When you're ready to move forward, Plan Development turns your chosen direction into a buildable plan: every selection made, construction drawings completed, a trade walkthrough at your home, and a code compliance review. It ends with your fixed-price construction contract and construction schedule, presented together. Plan Development averages about 50 days.

The Plan Development fee is 5% of the midpoint of the budget range we present at the end of your Build Study. It's credited to your construction contract if you sign within 15 days.

Investment

What Does The Build Study Cost?

From $1,500

The Build Study starts at $1,500. For additions and whole home renovations, it's 1% of the estimated budget range we discuss at your home. Third-party services your project may need are quoted before we order them.

If you sign Plan Development within 15 days of your budget presentation, your Build Study fee, less any third-party costs, is credited toward Plan Development.

Think of it as the most important money you'll spend on your remodel. It's what protects the rest of your investment from guesses, surprises, and change orders.

Is It Right for You

Is The Build Study Right for You?

It's a great fit if you:

Are planning a kitchen, primary suite, whole home renovation, or addition
Plan to stay in your home for years
Want to know the real cost before you commit
Value a clear process over the cheapest number

It may not be the right fit if you:

Already have finished plans from another designer
Are looking for the lowest possible bid
Need a small repair or a single-item replacement
Our Guarantees

Certainty That Continues Into Construction

The Build Study is where certainty starts. Our guarantees are where it continues.

$250 a day

On-Time Guarantee

You get a guaranteed substantial completion date before construction starts. If we're late for reasons within our control, we pay you $250 for every day.

Our miss, our cost

No Surprise Change Orders

If our design or estimate misses something we should have caught, we cover it. You never get a change order for our mistake.

Changes you request, weather, permit and city inspection delays, items you supply, supply delays outside our control, and truly hidden conditions are excluded.

97%
of clients who finish design with us build with us
27
homeowners came back for a second project
308
projects completed since 2017
Lee G.'s mid-century white oak kitchen remodel in Golden, Colorado

“I liked them so much, I hired them again. The process was very smooth and stress free... All of this was done within the time line initially presented. My kitchen is just beautiful, and I am picky.”

Lee G., Golden, CO · Repeat Client
See Lee's kitchen →
Five-Star Reviews

Our Clients Love Us

Frequently Asked Questions

Why do you charge for The Build Study?

Because real answers take real work. Measuring your home, drawing it, designing options, testing, and pricing them takes skilled people many hours. A free estimate skips that work, which is why free numbers so often change later.

How much does The Build Study cost?

The Build Study starts at $1,500. For additions and whole home renovations, it's 1% of the estimated budget range we discuss at your home. Third-party services your project may need are quoted before we order them. If you sign Plan Development within 15 days of your budget presentation, your fee, less third-party costs, is credited toward it.

How long does The Build Study take?

About 51 days on average, depending on your project and whether testing, zoning research, or engineering is needed.

What happens after The Build Study?

If you'd like to move forward, we begin Plan Development: every selection, construction drawings, a trade walkthrough, and code review, ending in a fixed-price construction contract and schedule. It averages about 50 days.

Am I committed to building with VL after The Build Study?

No. The Build Study gives you the information to decide. Most clients continue because they finally know what their project will cost and how it will come together.

Do I keep my drawings if I don't move forward?

Everything we produce, including drawings and your budget, remains the property of VL Builders. You get copies for reference, not to bid or build your project elsewhere.

What if my project isn't feasible?

Then you'll know before spending money on full design or construction. That's one of the most valuable outcomes The Build Study can deliver, especially for additions.

Is The Build Study only for large projects?

It's designed for kitchens, primary suites, whole home renovations, and additions, where real planning makes the biggest difference.

How is The Build Study different from a free consultation?

A consultation is a conversation. The Build Study is a measured, designed, and priced study of your actual home.

Let's Talk About Your Home

Visit our Lakewood showroom at 7885 W 16th Ave, or start with a conversation about your project. Your Discovery Call can be by phone or video, and every request gets a personal call from our team.