Our Guarantees

Your Schedule and Your Price, Guaranteed in Writing

Before construction starts, you have a fixed price and a completion date. Our guarantees put real money behind both.

Kitchen remodel by VL Builders with wood floors, open shelving, a sage cabinet wall and plants
Why We Can Guarantee It

Certainty Starts Long Before Construction

Most remodelers can't promise a date or a price, because they're still working out the project after the walls come down. We do that work first. The Build Study measures, tests, designs and prices your home. Plan Development makes every selection, finishes the construction drawings, walks the job with our trades and checks it against code.

By the time you sign your construction contract, there's very little left to guess. That's what lets us put our schedule and our estimate in writing.

Dining area in a main floor remodel by VL Builders with a wood table, plants and a black-framed glass wall
The On-Time Guarantee
$250 a day

Your Completion Date, Guaranteed

Before construction starts, you get your substantial completion date in writing. If we're late for reasons within our control, we pay you $250 for every day.

01

Your date, before you build

Plan Development ends with your fixed-price contract and your construction schedule, presented together.

02

A schedule built on a finished plan

Every selection is made and the drawings are finished before we start, so the dates aren't a guess.

03

$250 for every late day

If we miss your date for reasons within our control, we pay you $250 for each day we're late.

What's covered

Your substantial completion date, set before construction starts
Any delay within our control
$250 paid to you for every day we're late

What's not covered

Changes you request
Weather, and permit or city inspection delays
Items you supply
Supply delays outside our control
No Surprise Change Orders
Our miss, our cost

If We Should Have Caught It, We Cover It

We do the homework before you sign, so your price is built on what's really in your home. If our design or our estimate still misses something we should have caught, we cover the cost. You never get a change order for our mistake.

How we catch things before you build
A detailed site measure and as-built drawings of your home
Asbestos testing when your project needs it
For additions: zoning and code research, a soils report if your site needs one, and a structural engineering consultation
A trade walkthrough at your home and a code compliance review before construction
What it doesn't cover

Two exceptions

Changes you request. If you change a selection or add to the scope during construction, that's a change order, and it can move your completion date.

Truly hidden conditions. Some things can't be seen until walls or floors are open, even after a thorough Build Study. Those aren't covered, and we'll talk them through with you if one comes up.

“

VL doesn't start the project until all details are decided and all materials are on hand. Once demolition began, there were workers here every day during the 8-week process and the project plan was spot on.

Amy K. · Google review
After We Finish
2 years

A Workmanship Warranty, With Check-Ins

Every project includes a 2-year workmanship warranty. We don't wait for you to call. We check in five times over those two years to make sure everything is working the way it should.

90 days
Check-in 1
6 months
Check-in 2
1 year
Check-in 3
18 months
Check-in 4
23 months
Final check-in
97%
of clients who finish design with us build with us
27
homeowners came back for a second project
308
projects completed since 2017
Lee G.'s mid-century white oak kitchen remodel in Golden, Colorado

“I liked them so much, I hired them again. The process was very smooth and stress free... All of this was done within the time line initially presented. My kitchen is just beautiful, and I am picky.”

Lee G., Golden, CO · Repeat Client
See Lee's kitchen →

Frequently Asked Questions

When do I get my completion date?

With your fixed-price construction contract. Plan Development ends with your contract and your construction schedule presented together, so your substantial completion date is in writing before construction starts.

What's excluded from the On-Time Guarantee?

Changes you request, weather, permit and city inspection delays, items you supply, and supply delays outside our control. Delays within our control are covered at $250 for every day we're late.

What does No Surprise Change Orders cover?

Anything our design or our estimate should have caught. If we missed it, we cover it. Changes you request and truly hidden conditions aren't covered.

Can I still make changes during construction?

Yes. Changes you ask for are handled as change orders. Because they're your choice, they sit outside both guarantees and can move your completion date.

How long is your warranty?

Every project includes a 2-year workmanship warranty, with check-ins at 90 days, 6 months, 1 year, 18 months and 23 months.

How can you guarantee a date and a price?

Because we do the hard work first. The Build Study and Plan Development measure, test, design, price and code-check your project before construction starts, so very little is left to guess.

Let's Talk About Your Home

Visit our Lakewood showroom at 7885 W 16th Ave, or start with a conversation about your project. Your Discovery Call can be by phone or video, and every request gets a personal call from our team.